Hydromechanical Equipment of Shahriar Dam as EPC

سد شهریار

Design, material supply, fabrication, and installation of hydromechanical equipment for Shahriar Dam

  • Client: Tuba Hydro Power Engineering and Management Company
  • Contractor: Arman Sanat Tadbir Andish Company
  • Consultant: Mahab Ghods Consulting Engineers Company
  • Location: Miyaneh County, Shahriar Dam
  • Status: Completed
  • Execution Time: Year 2006
  • Progress: 100%
  • Project Quality Control Tests: MT (Magnetic Testing) – PT (Penetrant Testing) – RT (Radiographic Testing) – UT (Ultrasonic Testing)
سد شهریار
سد شهریار
سد شهریار
Weight Dimensions Quantity Design, Fabrication, and Installation
3 * 90 ton 15m x 13m 3 device Radial Spillway Gate Including Servo Motor
130 ton 15m x 13.5m 5 segment Stablock Spillway Gates with Associated Winch
15 ton 3.5m x 5.9m 2 segment Maintenance Gates in the Lower Channel with Associated Winch
120 ton 3.5m x 6.5m 3.5m x 5.9m    3m x 4.2m Rectangular Cross-Section Bottom Lining
45 ton 3m x 4m 1 device Emergency Casing Gate Including Servo Motor
35 ton 3m x 4m 1 device Radial Gate of Lower Channel with Servo Motor
2 x 14 ton 4.2m x 2.53m x 1.83m 2 device Trunnion Box
2 x 22 ton 5.4m x 2.53m x1.83m 2 device Trunnion Box
Gantry Crane with a Capacity of 45 ton     
Overhead Crane with a Capacity of 20 ton         