Busducts of Siah Pisheh Pumped Storage Power Plant as EPC Projects Design, equipment supply, and fabrication of bus ducts for four units of the Siah Bisheh hydropower plant and related auxiliary equipment Employer: Farab CompanyContractor: Arman Sanat Tadbir Andish CompanyConsultant: Moshanir CompanyLocation: Mazandaran Province – Siah Bisheh DamStatus: CompletedExecution Time: Year 2006Progress: 100%Project Quality Control Tests: UT, RT, PT, MT, DT, Voltage Test, Frequency Test Main Bus Duct: Material Al1350-H112 , Length 1320 mConductors ɸ580 x 10 mm , Enclosure ɸ1100 x 6 mmRated Current 12.5 KA , Short Circuit Current 100 (rms) , 300 KADelta Bus Duct: Material Al1350-H112 , Length 280 m Conductors ɸ280 x 10 mm , Enclosure ɸ800 x 5 mm Rated Current 7.2 KA , Short Cricuit Current 125 (rms) , 350 KAStarting and Auxiliary Bus Duct: Material Al1350-H112 , Length 720mRated Current 1.6 KA , Short Cricuit Current 180 (rms) , 500 KA Project-related photos
Material Handling Equipment for the Wharf of the Persian Gulf Special Economic Zone of Metal and Mining Industries as EPC
Installation and Commissioning of Electrical and Instrumentation Equipment at Mahabad Petrochemical Complex