Mechanical Equipment and Piping of Masjed Soleyman Dam and Power Plant

نصب و راه اندازی تجهیزات مکانیکی و پایپینگ طرح توسعه نیروگاه مسجدسلیمان

Installation and commissioning of mechanical equipment and piping for Masjed Soleyman power plant expansion project

  • Employer: Farab Company
  • Contractor: Arman Sanat Tadbir Andish Company
  • Consultant: Farab Company
  • Project Operation Location: Khuzestan Province – Masjed Soleyman Power Plant
  • Project Location: Arman Sanat Tadbir Andish Company Site – Masjed Soleyman – Masjed Soleyman Power Plant
  • Status: Completed
  • Progress: 100%
  • Execution Time: 2003
  • Project Quality Control Tests: RT, PT, MT, Hydro Test

Worked Systems:

  • Main Cooling System of the Power Plant
  • AS System and AB System of the Power Plant
  • All Instrumentation Systems of the Power Plant Expansion Project
  • Dewatering System and Firefighting System of the Power Plant

Project-related photos

تجهیزات مکانیکی و پایپینگ نیروگاه مسحد سلیمان
تجهیزات مکانیکی و پایپینگ نیروگاه مسحد سلیمان
تجهیزات مکانیکی و پایپینگ نیروگاه مسحد سلیمان
تجهیزات مکانیکی و پایپینگ نیروگاه مسحد سلیمان
تجهیزات مکانیکی و پایپینگ نیروگاه مسحد سلیمان

Leave a Reply

Your email address will not be published. Required fields are marked *

en_US