Generator Busduct Installation at Karun 3 Dam Power Plant

باسداکت ژنراتور

Installation of generator busducts (4 power plant units) and installation of compressed air system (8 power plant units) along with related equipment at Karun 3 Dam

  • Employer: Farab Company
  • Contractor: Arman Sanat Tadbir Andish Company
  • Consultant: Farab Company
  • Status: Completed
  • Execution Site: Arman Sanat Tadbir Andish Company Site – Izeh – Karun 3 Dam
  • Project Operation Location: Khuzestan Province – Karun 3 Dam Power Plant
  • Execution Time: 2004
  • Progress: 100%
  • Project Quality Control Tests: UT, RT, PT, MT, DT, Voltage Test, Frequency Test
  • Equipment Weight: Approximately 400 tons
  • Equipment Material: Aluminum – Steel