Auxiliary Electrical Systems of Karun 3 Power Plant

سیستم های برقی کمکی نروگاه کارون 3

Installation and commissioning of all electrical equipment for Auxiliary systems and Main systems of Units 1 to 4 of the power plant

  • Employer: Farab Company
  • Contractor: Arman Sanat Tadbir Andish Company
  • Project Operation Location: Khuzestan Province – Karun 3 Power Plant
  • Project Location: Arman Sanat Tadbir Andish Company Site – Karun 3 Power Plant
  • Execution Time: 2005
  • Project Quality Control Tests: Megger Test, High Pot Test, VT

Performed Operations

  • Approximately 400 kilometers of cable laying operations
  • Installation of all control and power panels
  • Installation of lighting and grounding systems for 8 power plant units and dam structure
  • Installation of overall network system, telephone system, paging system, and CCTV cameras for 8 power plant units and dam structure

Project-related photos

سیستم های برقی کمکی نروگاه کارون 3
سیستم های برقی کمکی نروگاه کارون 3
سیستم های برقی کمکی نروگاه کارون 3
سیستم های برقی کمکی نروگاه کارون 3
سیستم های برقی کمکی نروگاه کارون 3

Leave a Reply

Your email address will not be published. Required fields are marked *

en_US